- 单项选择题 Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(2)处填()
A、activity
B、work
C、currency
D、time
- C
关注下方微信公众号,在线模考后查看
热门试题
- 活动A的悲观估计(P)是36天,最可能估
- Project schedule ma
- 你刚刚知道美国环境保护机构颁布了一项新的
- 权变措施(workaround)是()。
- 流程管理是企业管理的一个重要内容,一般来
- LVS负载均衡技术使用了多种算法来实现负
- 通信中PLC技术是指()
- 物联网发展的主要推动力一般不包括()
- 下面哪种安全技术不属于802.11的标准
- 螺旋模型是一种演进式的软件过程模型,结合
- 使用隧道技术的缺点是()
- 若浮点数的阶码用移码表示,尾数用补码表示
- 以下关于合同收尾的叙述中,()是不正确的
- 下列选项中,项目经理进行成本估算时不需要
- 在软件开发项目中强调"个体和交互胜过过程
- 在项目收尾阶段,最多的矛盾来自于()
- 你的机构正开始一个新的项目,其项目团队是
- IPv6组播地址中的SCOPE范围字段是
- 如果一个企业经常采用竞争性定价或生产高质
- 针对大型IT项目,下列选项中()是不正确