- 单项选择题 Refer to the exhibit. ROUTE.com is planning to implement load balancing for traffic between hosts on the 172.16.10.0/24 and 172.16.20./24 networks. You have been ask ed to review the implementation plan for this project. Which statement about the plan is true?()
A、It is complete as written.
B、It should include a task to configure EIGRP multipath equal to 2 on R1 and R4.
C、It should inc lude a task to implement OSPF because it handles unequal cost load balancing most efficiently using variance.
D、It should include a task that establishes a baseline before and after the configuration has been changed.
- D
关注下方微信公众号,在线模考后查看
热门试题
- 请参见图示。管理员需要在此设备上使用哪个
- 某公司申请到一个C类IP地址,但要连接6
- A single 802.11g acc
- Option 10AQ
- Which two statements
- Which two benefits d
- A network administra
- What does a Layer 2
- When a DHCP server i
- 使用浮雕滤镜创建凹陷的效果,应在()
- Which two̳
- You are the network
- Refer to
- Refer to t
- Your company
- What is the advantag
- Which two̳
- Which statemen
- 数据分段是OSI七层模型中的()完成的
- What are