试题详情
- 单项选择题 A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()
A、A CD or DVD with installation media
B、An internal SCSI adapter in the target LPAR
C、An Ethernet adapter for access to an FTP server
D、Advanced Power Virtualization feature of the p5 590
- A
关注下方微信公众号,在线模考后查看
热门试题
- A customerQ
- A large
- An administrat
- A customer needs to
- Which port must be o
- 下列哪一个描述了企业服务总线(ESB)的
- 在动态LPAR方案中,需要在每个分区中配
- Which command(s) wil
- Which of
- A system
- If the A
- 一个在线的音乐商店让客户收听一个专辑前一
- The Virtualiza
- A customerQ
- A customerQ
- IBM Blade̳
- ower770最大支持的CPU核心数量?
- Power7中哪项技术可以通过内存压缩方
- To examine&ensp
- Which of the followi