- 多项选择题 pany has a Catalyst 6500 and you need to configure redundancy between the supervisor modules. With route processor redundancy (RPR+), the redundant supervisor engine is fully initialized and configured, which shortens the switchover time if the active supervisor engine fails. Which three statements are true about the RPR + operations when the redundant supervisor engine switched over the failed primary supervisor engine? ()
A、 Static IP routes are maintained across a switchover because they are configured from entries in the configuration file.
B、 Information about dynamic routing states, maintained on the active supervisor engine, is synchronized to the redundant supervisor engine and is transferred during the switchover.
C、 Information about dynamic routing states, maintained on the active supervisor engine, is not synchronized to the redundant supervisor engine and is lost on switchover.
D、 The Forwarding Information Base (FIB) tables are cleared on a switchover. As a result, routed traffic is interrupted until route tables reconverge.
E、 Static IP routes are cleared across a switchover and recreated from entries in the configuration file on the redundant supervisor engine.
F、 The Forwarding Information Base (FIB) tables are maintained during the switchover. As a result, routed traffic continues without any interruption when the failover occurs.
- A,C,D
关注下方微信公众号,在线模考后查看
- On the W
- Which componen
- What is the first 24
- An Enterprise&
- In which
- When usingQ
- Which command would
- If the dispersion of
- Which CiscoWor
- What is a characteri
- What is
- What does̳
- In which solution is
- What are the charact
- 请参见图示。两台交换机都配置有默认的网桥
- Anetworkadministrato
- When running
- CorelDRAW中复制对象的方法有()
- Which two̳
- Host 1 receives a fi