试题详情
- 单项选择题 A technician(技术) has a current baseline(基准线) and is told to install additional(添加) memory and a faster NIC card. At which point in time should the next baseline be run?()
A、 After the memory is installed
B、 Before the upgrade is performed
C、 After the NIC is installed
D、 After the upgrades are performed
- D
关注下方微信公众号,在线模考后查看
热门试题
- An administrat
- Which of the followi
- Which of the followi
- When installing exte
- Which is
- Which smb.conf
- When configuring a D
- A user wants to conv
- Which of the followi
- Which of the followi
- A technician
- Due to s
- A technician is tro
- Which Microsof
- Which of
- Before install
- Which of the followi
- Which of the followi
- A user’s workstation
- Which of