试题详情
- 单项选择题 Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(1)处填()
A、accuracy
B、approximation
C、specification
D、summary
- D
关注下方微信公众号,在线模考后查看
热门试题
- 根据《软件工程产品质量》GB/T1626
- 以下哪个是ETL的实现方式?()
- 为了保证LVS的Web管理工具Piran
- 【问题3】(5分) 经与客户协商,为确
- 关于IPSEC,以下说法错误的是()
- 项目正在紧张的进展之中,团队成员感到压力
- 项目沟通中不恰当的做法是()
- 对于LVM中PE与LE的描述错误的是()
- 配置审计包括物理审计和功能审计,()属于
- 计划编制的和实际的花费的累计成本曲线()
- 按照国际标准化组织制订的开放系统互连参考
- 在系统建设后期,建设方考虑到系统运维管理
- 试论述信息系统在企业内角色的演变过程,说
- 某市数字城市项目主要包括A、B、C、D、
- 你的15个人的团队中没有人以前曾在一起工
- 下面关于IT财务管理的表述中的哪一个是正
- 在松散型和紧密型的矩阵组织结构中,可能引
- 下列哪项不属于交付策划的内容()
- 基线由一组配置项组成,这些配置项构成了一
- 小张的U盘中存储有企业的核心数据。针对该