试题详情
多项选择题 Which two of these are correct regarding the recommended practice for distribution layer design based on the following configuration?()

A、use a Layer 2 link between distribution switches

B、use a Layer 3 link between distribution switches

C、use a redundant link to the core

D、use a Layer 3 link between distribution switches with route summarization

  • C,D
  • 关注下方微信公众号,在线模考后查看

热门试题