试题详情
- 单项选择题 Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(3)处填()
A、project scope statement
B、statement of work
C、project management plan
D、projectpolicy
- A
关注下方微信公众号,在线模考后查看
热门试题
- 下列哪项不属于配置管理的关键指标()
- 某软件开发项目的需求规格说明书第一次正式
- 软件需求分析要解决的问题是()。
- 在处理变更请求时变更经理已经执行了一系列
- 某家具厂有方木材90m3,木工板600m
- 需求工程帮助软件工程师更好地理解要解决的
- 在J2EE模型中,中间层的业务功能通过①
- 下列选项中,()不属于结构化分析方法所使
- () is a measurable,
- 项目整体管理要综合考虑项目各个相关过程,
- 副总裁给你打来紧急电话,说她15分钟后要
- 公有云和私有云结合叫做()
- 与SDB相比较,下列选项属于S3特点的是
- 模型.视图.控制器(MVC)模式是专门针
- 属于RUP最佳软件开发实践的是()
- ()是为了创造一种产品、服务或结果而进行
- 请简要说明该公司和项目经理应采取哪些措施
- 工作流(Workflow)就是工作流程的
- 如果你向一个5人组织的项目团队再增加3人
- 软件的维护并不只是修正错误。为了满足用户