- 单项选择题 Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process. 空白(2)处应选择()
A、activity
B、procedure
C、process
D、progress
- C
关注下方微信公众号,在线模考后查看
热门试题
- 以下关于CMM的叙述中,不正确的是()。
- 阅读下列说明和图,回答问题1至问题3,将
- 属于面向对象、解释型程序设计语言的是()
- 对高级语言源程序进行编译的过程可以分为多
- 某文件管理系统在磁盘上建立了位示图(bi
- 假设磁盘每磁道有18个扇区,系统刚完成了
- 设算法A的时间复杂度可用递归式表示,算法
- 算术表达式采用逆波兰式表示时不用括号,可
- 以下媒体中()是表示媒体,()是表现媒体
- TCP是互联网中的(1)协议,使用(2)
- 某文件管理系统在磁盘上建立了位示图(bi
- 总线复用方式可以()。
- ()既不是图像编码也不是视频编码的国际标
- 一棵满二叉树,其每一层节点个数都达到最大
- 系统中有R类资源m个,现有n个进程互斥使
- 进程P1、P2、P3、P4和P5的前趋图
- 若某文件系统的目录结构如图所示,假设用户
- 进程P1、P2、P3、P4和P5的前趋图
- 若某条无条件转移汇编指令采用直接寻址,则
- 下图所示的逻辑流实现折半查找功能,最少需